S-136 115kV line

2023, December 19: petition to cross

2023, exhibits for crossing

2023, November 15: Eversource TOPAC (Transmission Owners Planning Advisory Committee presentation to PAC, "Rebuild the aging 115kV line with larger conductor and OPGW "

2023, November 14: WMNF FOIA response cover letter

2023 October 3: WMNF small projects form for a $140 million dollar line rebuild

2023, May 31, Stantec to E$ WMNF

2023, May 31: E$ letter and plans re. S-136 rebuild WMNF

2020, August 20: order Nisi granting crossings, "The existing static wire will be replaced with optical ground wire in all crossing locations. No conductor, shield wire, or neutral wire will be added or replaced as part of the structure replacements; instead, existing conductors and wires will be transferred to the newly constructed steel support structures."

2020, August 7, staff revised map

2020, July 31: staff recommendation This is a project to modify or rebuild (14) fourteen structures on its existing S136 Line. No conductors or neutral wire will be replaced in the project. All electric wires shall be transferred from existing structures to new structures replaced at the same locations. The existing static wire will be replaced with (1) .457 OPGW cable. , "This is a project to modify or rebuild (14) fourteen structures on its existing S136 Line. No conductors or neutral wire will be replaced in the project. All electric wires shall be transferred from existing structures to new structures replaced at the same locations. The existing static wire will be replaced with (1) .457 OPGW cable. "

2020, July 2: USFS decision permitting project

2020, May 22: Start of construction form

2020, April 9: DES permit waiving specific requirements of: Env-Wq 1504.09,

2020, April 1: crossing petition supplement, " Eversource intends to complete four structure replacements...(Str. 293, 294 and 298, 299)... in addition to replacing the existing static wire with OPGW"

2020. April 1: crossing petition supplement exhibits;Androscoggin River, Moose Brook and state owned lands

2020, March 20: AoT application, Stantec

2019, October 24: PAC presentation local system plan, under-construction, $6.2 m. replace existing structures

2020, June 15: supplemental petition to cross Androscoggin River

2019, October 3: exhibits for crossing; (2) .457 OPGW, 795 ASCR conductor

2019, September 3: Petition to cross Androscoggin, Gorham and Randolph, no mention of OPGW

2019, September 3: exhibits for crossing Androscoggin, Gorham and Randolph. Two OPGW lines, conductors remain the same.

s-136_1.jpg

s-136_5.jpg

s-136_8.jpg

s-136_14.jpg

s-136_18.jpg

Structure with 795 ASCr conductor and 10 insulators

s-136.txt · Last modified: 2024/04/28 08:01 by sigridundset