Both sides previous revisionPrevious revisionNext revision | Previous revision |
s-136 [2024/04/20 09:53] – sigridundset | s-136 [2024/11/22 08:08] (current) – sigridundset |
---|
====== S-136 115kV line ====== | ====== S-136 115kV line ====== |
| |
| {{ ::eversource_2024_lsp_a.pdf |2024, November 20: Local System Plan, under-construction}} |
| |
| {{ :s136:eversource_fs_application_for_s-136_line_rebuild.pdf |2024, October 14: kp comment on Eversource application to Forest Service}} |
| |
| {{ :s136:project_information_form_-_eversource_s136_transmission_line_rebuild.pdf |2024, October 4: Eversource small projects day application for replacement of 214 structures and permanent road and crane pad construction in White Mountain National Forest}} |
| |
{{ :s136:s-136_-2023-027-application.pdf |2023, December 19: petition to cross}} | {{ :s136:s-136_-2023-027-application.pdf |2023, December 19: petition to cross}} |
{{ :s136:s-136_2020-08-07_staff_rev_recommendation.pdf |2020, August 7, staff revised map}} | {{ :s136:s-136_2020-08-07_staff_rev_recommendation.pdf |2020, August 7, staff revised map}} |
| |
{{ :s136:s-136_staff_recommendation.pdf |2020, July 31: staff recommendationThis is a project to | {{ :s136:s-136_staff_recommendation.pdf |2020, July 31: staff recommendation This is a project to |
modify or rebuild (14) fourteen structures on its existing S136 Line. No conductors or neutral wire will be replaced in the project. All electric wires shall be transferred from existing structures to new structures replaced at the same locations. The existing static wire will be replaced with (1) .457 OPGW cable. , "This is a project to modify or rebuild (14) fourteen structures on its existing S136 Line. No conductors or neutral wire will be replaced in the project. All electric wires shall be transferred from existing structures to new structures replaced at the same locations. The existing static wire will be replaced with (1) .457 OPGW cable. "}} | modify or rebuild (14) fourteen structures on its existing S136 Line. No conductors or neutral wire will be replaced in the project. All electric wires shall be transferred from existing structures to new structures replaced at the same locations. The existing static wire will be replaced with (1) .457 OPGW cable. , "This is a project to modify or rebuild (14) fourteen structures on its existing S136 Line. No conductors or neutral wire will be replaced in the project. All electric wires shall be transferred from existing structures to new structures replaced at the same locations. The existing static wire will be replaced with (1) .457 OPGW cable. "}} |
| |
| |
{{ ::decision_memo_eversource_s136_line_structure_and_optical_ground_wire_replacement_project.pdf |2020, July 2: USFS decision permitting project}} | {{ ::decision_memo_eversource_s136_line_structure_and_optical_ground_wire_replacement_project.pdf |2020, July 2: USFS decision permitting project}} |
{{ ::s136_des_permit_with_waivers_4-9-2020.pdf |2020, April 9: DES permit waiving | {{ ::s136_des_permit_with_waivers_4-9-2020.pdf |2020, April 9: DES permit waiving |
specific requirements of: Env-Wq 1504.09, }} | specific requirements of: Env-Wq 1504.09, }} |
| |
| {{ :s136:s-136_1_aot_area.png?linkonly |2020, April 9: 20.1 acres impacts}} |
| |
{{ :s136:19-162_2020-04-01_eversource_supp_petition_crossing.pdf |2020, April 1: crossing petition supplement, " Eversource intends to complete four structure replacements...(Str. 293, 294 and 298, 299)... in addition to replacing the existing static wire with OPGW"}} | {{ :s136:19-162_2020-04-01_eversource_supp_petition_crossing.pdf |2020, April 1: crossing petition supplement, " Eversource intends to complete four structure replacements...(Str. 293, 294 and 298, 299)... in addition to replacing the existing static wire with OPGW"}} |
| |
{{ :s136:19-162_2020-04-01_eversource_att_supp_petition_crossing.pdf |2020. April 1: crossing petition supplement exhibits, dated 6/19-11/19}} | {{ :s136:19-162_2020-04-01_eversource_att_supp_petition_crossing.pdf |2020. April 1: crossing petition supplement exhibits;Androscoggin River, Moose Brook and state owned lands}} |
| |
{{ ::s136_aot_application.pdf |2020, March 20: AoT application, Stantec}} | {{ ::s136_aot_application.pdf |2020, March 20: AoT application, Stantec}} |
{{ :s136:s-136_supp_petition_6-15-20_2020-06-15_eversource_supp_petition.pdf |2020, June 15: supplemental petition to cross Androscoggin River}} | {{ :s136:s-136_supp_petition_6-15-20_2020-06-15_eversource_supp_petition.pdf |2020, June 15: supplemental petition to cross Androscoggin River}} |
| |
{{ :s136:s-136_2019_exhibits_2_2019-10-03_eversource_att_petition_crossing_androscoggin_gorham_randolph.pdf |2019, October 3: exhibits for crossing}} | {{ :s136:s-136_2019_exhibits_2_2019-10-03_eversource_att_petition_crossing_androscoggin_gorham_randolph.pdf |2019, October 3: exhibits for crossing; (2) .457 OPGW, 795 ASCR conductor}} |
| |
{{ :s136:s-136_2019-10-03_eversource_petition_crossing_androscoggin_gorham_randolph.pdf |2019, September 3: Petition to cross Androscoggin, Gorham and Randolph, no mention of OPGW}} | {{ :s136:s-136_2019-10-03_eversource_petition_crossing_androscoggin_gorham_randolph.pdf |2019, September 3: Petition to cross Androscoggin, Gorham and Randolph, no mention of OPGW}} |