s-136
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
s-136 [2024/04/20 09:56] – sigridundset | s-136 [2025/07/05 03:05] (current) – sigridundset | ||
---|---|---|---|
Line 1: | Line 1: | ||
====== S-136 115kV line ====== | ====== S-136 115kV line ====== | ||
+ | " | ||
- | {{ :s136:s-136_-2023-027-application.pdf |2023, December 19: petition to cross}} | + | {{ ::eversource_2024_lsp_a.pdf |2024, November 20: Local System Plan, under-construction}} |
- | {{ :s136:s-136_-2023-027-exhibits.pdf |2023, exhibits for crossing}} | + | {{ :s136:eversource_fs_application_for_s-136_line_rebuild.pdf |2024, October 14: kp comment on Eversource application to Forest Service}} |
+ | |||
+ | {{ : | ||
+ | |||
+ | {{ :s136:cre-2023-027-license.pdf |2024, February 16: License for crossings}} | ||
+ | |||
+ | {{ :s136:cre-2023-027-staff-recommendation.pdf |2024, January 30: Staff recommendation}} | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | {{ : | ||
{{ :: | {{ :: | ||
Line 22: | Line 35: | ||
{{ : | {{ : | ||
modify or rebuild (14) fourteen structures on its existing S136 Line. No conductors or neutral wire will be replaced in the project. All electric wires shall be transferred from existing structures to new structures replaced at the same locations. The existing static wire will be replaced with (1) .457 OPGW cable. , "This is a project to modify or rebuild (14) fourteen structures on its existing S136 Line. No conductors or neutral wire will be replaced in the project. All electric wires shall be transferred from existing structures to new structures replaced at the same locations. The existing static wire will be replaced with (1) .457 OPGW cable. "}} | modify or rebuild (14) fourteen structures on its existing S136 Line. No conductors or neutral wire will be replaced in the project. All electric wires shall be transferred from existing structures to new structures replaced at the same locations. The existing static wire will be replaced with (1) .457 OPGW cable. , "This is a project to modify or rebuild (14) fourteen structures on its existing S136 Line. No conductors or neutral wire will be replaced in the project. All electric wires shall be transferred from existing structures to new structures replaced at the same locations. The existing static wire will be replaced with (1) .457 OPGW cable. "}} | ||
- | |||
{{ :: | {{ :: | ||
Line 30: | Line 42: | ||
{{ :: | {{ :: | ||
specific requirements of: Env-Wq 1504.09, }} | specific requirements of: Env-Wq 1504.09, }} | ||
+ | |||
+ | {{ : | ||
{{ : | {{ : |
s-136.1713621375.txt.gz · Last modified: 2024/04/20 09:56 by sigridundset