s-136 [2024/04/20 09:56] sigridundsets-136 [2024/11/22 08:08] (current) sigridundset
Line 1: Line 1:
 ====== S-136 115kV line ====== ====== S-136 115kV line ======
  
 +{{ ::eversource_2024_lsp_a.pdf |2024, November 20: Local System Plan, under-construction}}
 +
 +{{ :s136:eversource_fs_application_for_s-136_line_rebuild.pdf |2024, October 14: kp comment on Eversource application to Forest Service}}
 +
 +{{ :s136:project_information_form_-_eversource_s136_transmission_line_rebuild.pdf |2024, October 4: Eversource small projects day application for replacement of 214 structures and permanent road and crane pad construction in White Mountain National Forest}}
  
 {{ :s136:s-136_-2023-027-application.pdf |2023, December 19: petition to cross}} {{ :s136:s-136_-2023-027-application.pdf |2023, December 19: petition to cross}}
Line 22: Line 27:
 {{ :s136:s-136_staff_recommendation.pdf |2020, July 31: staff recommendation This is a project to {{ :s136:s-136_staff_recommendation.pdf |2020, July 31: staff recommendation This is a project to
 modify or rebuild (14) fourteen structures on its existing S136 Line. No conductors or neutral wire will be replaced in the project. All electric wires shall be transferred from existing structures to new structures replaced at the same locations. The existing static wire will be replaced with (1) .457 OPGW cable. , "This is a project to modify or rebuild (14) fourteen structures on its existing S136 Line. No conductors or neutral wire will be replaced in the project. All electric wires shall be transferred from existing structures to new structures replaced at the same locations. The existing static wire will be replaced with (1) .457 OPGW cable. "}} modify or rebuild (14) fourteen structures on its existing S136 Line. No conductors or neutral wire will be replaced in the project. All electric wires shall be transferred from existing structures to new structures replaced at the same locations. The existing static wire will be replaced with (1) .457 OPGW cable. , "This is a project to modify or rebuild (14) fourteen structures on its existing S136 Line. No conductors or neutral wire will be replaced in the project. All electric wires shall be transferred from existing structures to new structures replaced at the same locations. The existing static wire will be replaced with (1) .457 OPGW cable. "}}
- 
  
 {{ ::decision_memo_eversource_s136_line_structure_and_optical_ground_wire_replacement_project.pdf |2020, July 2: USFS decision permitting project}} {{ ::decision_memo_eversource_s136_line_structure_and_optical_ground_wire_replacement_project.pdf |2020, July 2: USFS decision permitting project}}
Line 30: Line 34:
 {{ ::s136_des_permit_with_waivers_4-9-2020.pdf |2020, April 9: DES permit waiving {{ ::s136_des_permit_with_waivers_4-9-2020.pdf |2020, April 9: DES permit waiving
 specific requirements of: Env-Wq 1504.09, }} specific requirements of: Env-Wq 1504.09, }}
 +
 +{{ :s136:s-136_1_aot_area.png?linkonly |2020, April 9: 20.1 acres impacts}}
  
 {{ :s136:19-162_2020-04-01_eversource_supp_petition_crossing.pdf |2020, April 1: crossing petition supplement, " Eversource intends to complete four structure replacements...(Str. 293, 294 and 298, 299)... in addition to replacing the existing static wire with OPGW"}} {{ :s136:19-162_2020-04-01_eversource_supp_petition_crossing.pdf |2020, April 1: crossing petition supplement, " Eversource intends to complete four structure replacements...(Str. 293, 294 and 298, 299)... in addition to replacing the existing static wire with OPGW"}}