 ====== S-153 115kV line ====== ====== S-153 115kV line ======
  
 +The S153 line originates in Stratham and ends in Portsmouth. It shares the easement with the A-126, and a gas line.
  
 {{ :may_18_2023_e_pac_lines_map.png?linkonly |map of project location}} {{ :may_18_2023_e_pac_lines_map.png?linkonly |map of project location}}
  
-{{ :a126:aot-2412_permit_rm.pdf |2023, June 27: Alteration of Terrain permit with waivers}}+{{ :3135:a-126_s-153_3135.pdf |2023, June 3, withdrawn DES permit application for construction}}
  
-{{ :a126:aot-2412_plans.pdf |2023, June 16Alteration of Terrain plans}}+{{ :a126:a124_-_h141_-_s153_start_of_construction_notice.pdf |2023, May 23Start of construction notice}}
  
-{{ ::391:2023_05_18_meeting_minutes_final.pdf |2023, May 18 PAC minutes "A stakeholder suggested the ISO could take an “if you build it, they will come approach” but another stakeholder raised concern that this could be “building a bridge to nowhere.” "}}+{{ :a126:a_126_-_h141_-_s153_des_permit_with_waivers.pdf |2023, May 21: DES permit with waivers}}
  
-{{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18, presentation to PAC, replace 16 out of 51 structures; $5. million}}+{{ :a126:a126_-_h141_-_s153_aot.pdf |2023, May 18: Environmental Resources Map}}
  
-{{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18, presentation to PAC, replace 35 out of 182 structures; $8.4 million}}+{{ ::391:2023_05_18_meeting_minutes_final.pdf |2023, May 18: PAC minutes "A stakeholder suggested the ISO could take an “if you build itthey will come approach” but another stakeholder raised concern that this could be “building a bridge to nowhere.” "}}
  
-{{ ::2023_05_18_meeting_minutes_final.pdf |2023 may 18 PAC minutes}}+{{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18, presentation to PAC, replace 16 out of 51 structures; $5. million}}
  
-{{ :r193_-_a121_-_h141_aot_permit_application.pdf |2023May 5 AoT application}}+{{ ::2023_05_18_meeting_minutes_final.pdf |2023 May 18 PAC minutes}}
  
-{{ ::a126:aot-2412_miscellaneous_r.pdf |2023, May 5cover letter for Alteration of Terrain application. "The proposed project includes the replacement of 76 existing utility structures on the R193, A126, and H141 transmission lines that must be replaced because they have reached the end of their service life."}}+{{ ::s153:5-9-2023_a-126_h-141_s-153.pdf |2023, May 9F&G permit conditions}}
  
-{{ ::2023_05_18_meeting_minutes_final.pdf |2023 may 18 PAC minutes}}+{{ :a126:a126_-_h141_-_s153_aot_checklist.pdf |2023, April 3: AOT checklist}}
  
-{{ :r193_-_a121_-_h141_aot_permit_application.pdf |2023, May 5 AoT application}}+{{ :a126:a126_-_h141_-_s153_aot_.pdf |2023, March 22: Alteration of Terrain application. "New steel poles will be installed. Existing conductors and static wire will be transferred to new steel poles."}}
  
-{{ ::a126:aot-2412_miscellaneous_r.pdf |2023, May 5: cover letter for Alteration of Terrain application. "The proposed project includes the replacement of 76 existing utility structures on the R193, A126, and H141 transmission lines that must be replaced because they have reached the end of their service life."}} +{{ :s153:s-153_cup_5-15-2023.pdf |2023, March 15Conditional Use Permit application for Greenland}}
- +
- +
- +
-{{ :a126:r193_-_a126_-_h141_des_permit_with_waivers.pdf |2023, June 27: DES permit with waivers}} +
- +
-{{ :a126:a124_-_h141_-_s153_start_of_construction_notice.pdf |2023, May 23Start of construction notice}} +
- +
-{{ :a126:a_126_-_h141_-_s153_des_permit_with_waivers.pdf |2023, May 21: DES permit with waivers}} +
- +
-{{ :a126:a126_-_h141_-_s153_aot.pdf |2023, May 18: Environmental Resources Map}} +
- +
-{{ :a126:r193_-_a121_-_h141_aot_permit_application.pdf |2023, May 5: AOT permit application}} +
- +
-{{ :a126:a126_-_h141_-_s153_aot_checklist.pdf |2023, April 3: AOT checklist}}+
  
-{{ :a126:a126_-_h141_-_s153_aot_.pdf |2023, March 23: Alteration of Terrain application}} 
  
-{{ ::oct_17_2018_seven_115kv_asset_conditions_lines_partial.pdf |2018, October 17, presentation to PAC, replace 49 structures, $8.3 million}} 
  
  