====== S-153 115kV line ====== | ====== S-153 115kV line ====== | ||
+ | The S153 line originates in Stratham and ends in Portsmouth. It shares the easement with the A-126, and a gas line. | ||
{{ : | {{ : | ||
- | {{ :a126:aot-2412_permit_rm.pdf |2023, June 27: Alteration of Terrain | + | {{ :3135:a-126_s-153_3135.pdf |2023, June 3, withdrawn DES permit |
- | {{ :a126:aot-2412_plans.pdf |2023, | + | {{ :a126:a124_-_h141_-_s153_start_of_construction_notice.pdf |2023, |
- | {{ ::391: | + | {{ :a126:a_126_-_h141_-_s153_des_permit_with_waivers.pdf |2023, May 21: DES permit with waivers}} |
- | {{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18, presentation to PAC, replace 16 out of 51 structures; $5. million}} | + | {{ :a126:a126_-_h141_-_s153_aot.pdf |2023, May 18: Environmental Resources Map}} |
- | {{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18, presentation | + | {{ ::391: |
- | {{ ::2023_05_18_meeting_minutes_final.pdf |2023 may 18 PAC minutes}} | + | {{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18, presentation to PAC, replace 16 out of 51 structures; $5. million}} |
- | {{ :r193_-_a121_-_h141_aot_permit_application.pdf |2023, May 5 AoT application}} | + | {{ :: |
- | {{ ::a126:aot-2412_miscellaneous_r.pdf |2023, May 5: cover letter for Alteration of Terrain application. "The proposed project includes the replacement of 76 existing utility structures on the R193, A126, and H141 transmission lines that must be replaced because they have reached the end of their service life."}} | + | {{ ::s153:5-9-2023_a-126_h-141_s-153.pdf |2023, May 9: F&G permit conditions}} |
- | {{ ::2023_05_18_meeting_minutes_final.pdf |2023 may 18 PAC minutes}} | + | {{ :a126:a126_-_h141_-_s153_aot_checklist.pdf |2023, April 3: AOT checklist}} |
- | {{ :r193_-_a121_-_h141_aot_permit_application.pdf |2023, | + | {{ :a126:a126_-_h141_-_s153_aot_.pdf |2023, |
- | {{ ::a126:aot-2412_miscellaneous_r.pdf |2023, May 5: cover letter for Alteration of Terrain application. "The proposed project includes the replacement of 76 existing utility structures on the R193, A126, and H141 transmission lines that must be replaced because they have reached the end of their service life." | + | {{ :s153:s-153_cup_5-15-2023.pdf |2023, |
- | + | ||
- | + | ||
- | + | ||
- | {{ :a126:r193_-_a126_-_h141_des_permit_with_waivers.pdf |2023, June 27: DES permit with waivers}} | + | |
- | + | ||
- | {{ : | + | |
- | + | ||
- | {{ : | + | |
- | + | ||
- | {{ : | + | |
- | + | ||
- | {{ : | + | |
- | + | ||
- | {{ : | + | |
- | {{ : | ||
- | {{ :: | ||