S-153 115kV line

map of project location

2023, June 27: Alteration of Terrain permit with waivers

2023, June 16: Alteration of Terrain plans

2023, May 18 PAC minutes "A stakeholder suggested the ISO could take an “if you build it, they will come approach” but another stakeholder raised concern that this could be “building a bridge to nowhere.” "

2023, May 18, presentation to PAC, replace 16 out of 51 structures; $5. million

2023, May 18, presentation to PAC, replace 35 out of 182 structures; $8.4 million

2023 may 18 PAC minutes

2023, May 5 AoT application

2023, May 5: cover letter for Alteration of Terrain application. "The proposed project includes the replacement of 76 existing utility structures on the R193, A126, and H141 transmission lines that must be replaced because they have reached the end of their service life."

2023 may 18 PAC minutes

2023, May 5 AoT application

2023, May 5: cover letter for Alteration of Terrain application. "The proposed project includes the replacement of 76 existing utility structures on the R193, A126, and H141 transmission lines that must be replaced because they have reached the end of their service life."

2023, June 27: DES permit with waivers

2023, May 23: Start of construction notice

2023, May 21: DES permit with waivers

2023, May 18: Environmental Resources Map

2023, May 5: AOT permit application

2023, April 3: AOT checklist

2023, March 23: Alteration of Terrain application

2018, October 17, presentation to PAC, replace 49 structures, $8.3 million