R-187 115kV line

2022, June 30: complete DE-22-049 document listing E$ proposed spending

2021, December 1; crossing granted

2021, October 20; PAC submission, replace 31 out of 31 structures, $7.5 m.

2021, September 21; staff recommendation

2021, May petition

2021, May petition exhibits

pole in good condition being cut down

pole stub after felling

pole in good condition laying on altered terrain. "Recent structure replacements have revealed additional concerns about the integrity of laminated wood structures installed between 2000 and 2014"

good condition labeled felled pole

inspection or treatment tag

very long good condition pole on trucked in gravel pad

pole pile on trucked in gravel pad

same pole pile showing extensive cleared and graveled land

Pole with tag and number