2023, January 19, presentation to PAC, 29 out of 145 structures replaced, $6.2 m.
2023, January 9 DES permit with waivers from requirements of Env-Wq 1503.12(d)(1), Env-Wq 1503.21(d)(6) and (7), and Env-Wq 1504.09
2023, January 9-16: DES and GZA emails
2023, April 28: Wildlife protection plan
2022, December 20: Environmental Resources map
2022, December 19 : Fish & Game Wildlife recommendations
2022, November 28: AOT application
2022, September 9: AOT transmittal cover page
2022, September 2: DES permit with waivers from Env-Wq 1503.12(d)(1&2), Env-Wq 1503.21(d)(6&7), and Env-Wq 1504.09
2022, September 2: Start of Construction Notification
2022, August 15: permit
2022, July 27: staff recommendation
2022:July 22: E$ petition for river crossing
2022, petition attachments
2022, June 28: Surface and Groundwater resources
2022, June 15: presentation to PAC
2010, October 15: Order nisi
2010, October 15: Staff recommendation
2010, September 30; revised petition for crossing Glen Lake, Goffstownhe C- 196 line as presently constructed
and licensed by the Commission, crosses Glen Lake with 3 phase wires and two static wires. PSNH proposes to replace one of the static wires with an optical ground wire (OPGW).; "The C- 196 line as presently constructed and licensed by the Commission, crosses Glen Lake with 3 phase wires and two static wires. PSNH proposes to replace one of the static wires with an optical ground wire (OPGW)."
2010, September 3: petition for crossing Glen Lake