L-176

Webster to Laconia

2019, March 10: Order Nisi; "grants Eversource amended licenses to replace a shield wire with fiber optical ground wire over and across the public waters of the Pemigewasset River and Lake Winnisquam in Franklin and Belmont, respectively"

2019, October 7: notification of alteration exhibits, Belmont, Tilton, Laconia

2019, October 7: notification of altertion, exhibit 2

2019, April 5: "Amended petition for crossing; "as a result of concerns raised by our HDD contractors relating to the type of soils to be encountered, and the higher risk of a "frack out" which could result in an undesirable release of drilling fluids into the waters of the Lake, an engineering and environmental determination has been made to use conventional trenching methods for the Belknap Point shoreline installation, instead of HDD. Please note that the use of conventional trenching on the Welch Island shoreline was always planned and is not being altered

2018, October 5: staff recommendation

2018, July 9: staff recommendation; "This is a rebuild of existing lines for a capital reliability project. ES’s existing Li 76 transmission line and the 3 98 line are not being relocated as result of this project but rather rebuilt with the existing conductors"

2018, April 10: petition for crossings, Belmont, Tilton, Laconia

2018, May 10: petition for crossing, exhibits

2018, April 30: application for crossing Winnipesaukee River, Belmont and Tilton

2017, July 25: Pemigewasset River Local Advisory Committee, minutes, problems with L-176 construction