User Tools

Site Tools


project_plans

This is an old revision of the document!


Project Plans

2025, April: Re-routing of Reel Brook Trail, apparently around the existing trail which Eversource plans to turn into a road with two cross-roads, to access the X-178

2025, February 26: GZA response to questions about geotechnical boring in WMNF

2025, February 11: GZA boring plan Thornton dump

2025, February 7: email re. incomplete application for geotechnical boring in WMNF

2025, January 22: Forest Service project vicinity map, X-178 (1)

December 23: Eversource waivers from DES permit requirements

2025, January 20: Statutory Permit by Notification for geotechnical borings of unstated depth on the X-178 easement in White Mountain National Forest."Threats to both the medium level fen system and poor level fen/bog system include changes to hydrology, especially those that result in pooling, increased nutrient input and increased sedimentation."

2025, January 19: Comment on structure age

2025, January 18: Comment on Eversource application for a Variance from Easton's structure height restriction

2025, January 7: Eversource application for a variance from Easton's structure height restriction.

2025, January: Eversource Site Plan Review application to Easton

2025, January 7: Eversource application for a variance from Easton's structure height restriction.

2025, January: Eversource Site Plan Review application to Easton

2025, January: Eversource application for a Conditional Use Permit for Easton Steep Slopes areas

2025, January: Eversource application for a Conditional Use Permit for Easton's Wetlands Conservation District Overlay District

2024, November 18 (discovered): X-178 (2) Phase 2 permitting plans

2024, November 18: email and Eversource presentation on Thornton Landfill Dump. ACSS conductor not good for long spans. Code clearance for pedestrian areas 16'

2024, September 12: Road Grading White Mountain National Forest

2024, August 12: Section 2, Phase 2 maps with 2' lidar-derived contour lines. White Mountain National Forest.

2024, August (received): post-construction grade of roads, pull pads and crane pads, Easton Phase 1

2024, August 6 released by a 91-a: X-178 (2) Phase 1 Alteration of Terrain application, dated March 20 2024, permitted/approved 5/28/2024, permit good until 5/28/2029.

project_plans.1745911041.txt.gz · Last modified: 2025/04/29 03:17 by sigridundset

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki