z-119
This is an old revision of the document!
Z-119 115kV line, constructed in 2008
Eversource laminated pole problem
exhibits 1-6, conductor is the same size as the proposed Northern Pass HVAC line; 1590 kcmil ACSR
z-119.1686767001.txt.gz · Last modified: 2023/08/30 07:51 (external edit)