Previous revision
379 [2023/09/27 08:16] sigridundset379 [2024/04/06 09:15] (current) sigridundset
Line 1: Line 1:
 379 345kV line 379 345kV line
  
 +{{ :may_18_2023_e_pac_lines_map.png?linkonly |map showing line location}}
  
 {{ ::a05_es_381_379_optical_ground_wire_upgrade.pdf |2023, January 19, presentation to PAC, replace shield wire}} {{ ::a05_es_381_379_optical_ground_wire_upgrade.pdf |2023, January 19, presentation to PAC, replace shield wire}}
  
-{{ ::1-cre_2022-024-applicaton.pdf |}}+{{ ::4_cre-2022-024-license.pdf |2022, November 8: license for crossing}}
  
-{{ ::1-cre-2022-013-petition.pdf |}}+{{ ::1-cre_2022-024-applicaton.pdf |2022, October 24: application for crossing}}
  
-{{ ::2-cre-2022-013-petition-attachments.pdf |2022, March 16, water crossing diagrams also dated 12/2016. Required 20' clearance exceeded by 45'}}+{{ ::3-cre-2022-024-energy-staff-recommendation.pdf |2022, November 2: staff recommendation}}
  
-{{ :379:379_environmental_permitting_plan_set_5-5-2022.pdf |}}+{{ ::2-cre-2022-024-_application-exhibits.pdf |2022, September 20: diagrams of crossing in Hinsdale, also dated 12/2016.}}
  
-{{ :379:379_-_n186_start_of_construction_form.pdf |}}+{{ ::379_-_n-186_des_permit_with_waivers.pdf |2022, July 8: DES permit with waivers of  of Env-Wq 1503.12(d), Env-Wq 1503.21(d)(6) and (7), and Env-Wq 1504.09,}}
  
-{{ :379:379_environmental_permitting_plan_set_5-5-2022.pdf |}}+{{ ::1-cre-2022-013-petition.pdf |2022, July 8: petition for crossing}}
  
-{{ :379:379_n186_aot_application_5-16-2022.pdf |}}+{{ :379:379_-_n186_start_of_construction_form.pdf |2022, July 11: start of construction notification to DES}}
  
-{{ ::3-cre-2022-024-energy-staff-recommendation.pdf |}}+{{ ::4-cre-2022-013-license.pdf |2022, May 19: license for crossing}}
  
-{{ ::4_cre-2022-024-license.pdf |2022, November 8: license for crossing}} +{{ :379:379_n186_aot_application_5-16-2022.pdf |2022, May 16AOT permit application}}
- +
-{{ ::2-cre-2022-024-_application-exhibits.pdf |2022, September 20: diagrams of crossing in Hinsdale, also dated 12/2016.}} +
- +
-{{ :379:aot2189_rm.pdf |2022, July 8, DES Alteration of Terrain permit with waivers}} +
- +
-{{ ::4-cre-2022-013-license.pdf |2022, May 19license for crossing}}+
  
 {{ :379:aot-2189_n-186_miscelleaneous_r.pdf |2022, May 6, Alteration of Terrain application}} {{ :379:aot-2189_n-186_miscelleaneous_r.pdf |2022, May 6, Alteration of Terrain application}}
Line 39: Line 34:
  
 {{ ::22_04-18_eversource_391_373_line_2022_chester_cup_opt_v2.pdf |2022, April Chester Public Hearing Notice}} {{ ::22_04-18_eversource_391_373_line_2022_chester_cup_opt_v2.pdf |2022, April Chester Public Hearing Notice}}
 +
 +{{ ::2-cre-2022-013-petition-attachments.pdf |2022, March 16, water crossing diagrams, also dated 12/2016. Required 20' clearance exceeded by 45'}}
  
 {{ ::a9_eversource_345kv_structure_replacement_projects.pdf |2017, December presentation to PAC, replacement of 54 out of 169 poles.}} {{ ::a9_eversource_345kv_structure_replacement_projects.pdf |2017, December presentation to PAC, replacement of 54 out of 169 poles.}}
 +
 +{{ :379:1997_k-165_379_opgw.pdf |1997, July 14: crossing of Merrimack River; ". The one location where the OPGW cable is to be installed will be on Line 379 crossing the Merrimack River in Litchfield and Merrimack.": }}
  
  
  