E-115 115kV Line $64 million | E-115 115kV Line $64 million |
| |
| {{ ::2023_11_15_topac_lsp_eversource_presentation.pdf |2023, November 15: Eversource TOPAC (Transmission Owners Planning Advisory Committee presentation to PAC}} |
| |
{{ ::e-115_z-1180_and_a-111_2023.pdf |2023, March 14: NEPOOL approval of $100 m.+ for A-11, E-115 and Z-180 for Transmission Cost Allowance}} | {{ ::e-115_z-1180_and_a-111_2023.pdf |2023, March 14: NEPOOL recommends ISO approval of $100 m.+ for A-11, E-115 and Z-180 for Transmission Cost Allowance}} |
| |
{{ ::e-115_z-1180_and_a-111_2023.pdf |2023, March: request to NEPOOL for TCA}} | {{ ::e-115_z-1180_and_a-111_2023.pdf |2023, March: request to NEPOOL for TCA}} |
| |
{{ :e115:e115_start_of_construction.pdf |2022, April 22: Start of Construction }} | {{ :e115:e115_start_of_construction.pdf |2022, April 22: Start of Construction }} |
| |
{{ ::e115:aot_e115_stamped.pdf |2022, March 22: Alteration of terrain plans first page stamped}} | |
| |
{{ ::03-29-22_mtg_minutes_prlac.pdf |2022, March 23; PRLAC (Pemigewasset River Local Advisory Committee) Minutes. Eversource later said no permits were required.}} | {{ ::03-29-22_mtg_minutes_prlac.pdf |2022, March 23; PRLAC (Pemigewasset River Local Advisory Committee) Minutes. Eversource later said no permits were required.}} |
| |
{{ :e115:e15_cover_page_stamped.pdf |2022, March 1 AoT first page stamped}} | {{ :e115:e15_cover_page_stamped.pdf |2022, March 1 AoT first page stamped}} |
| |
| {{ :e115:e115_aot_application_3-2022.pdf |2022, March: AoT application}} |
| |
{{ :e115:e115_ground_and_surface_water_overlay_map_2-21-2022.pdf |2022, February 21: Surface and Groundwater overlay maps, GZA}} | {{ :e115:e115_ground_and_surface_water_overlay_map_2-21-2022.pdf |2022, February 21: Surface and Groundwater overlay maps, GZA}} |
| |
{{ :iso_7-15-2021_no_significant_impact_of_interconnection.pdf |2021, July 15: no impact from interconnection}} | {{ :iso_7-15-2021_no_significant_impact_of_interconnection.pdf |2021, July 15: no impact from interconnection}} |
| |
| {{ :a111:a-111_1537_2021-0906.pdf |2021, March 9: inspection permit DES}} |
| |
{{ ::license-granted.pdf |2022, January 31: license granted}} | {{ ::license-granted.pdf |2022, January 31: license granted}} |
| |
{{ ::e1115crossing.pdf |2021, December 21: E$ petition for crossing}} | {{ ::e1115crossing.pdf |2021, December 21: E$ petition for crossing}} |
| |
| {{ :2017_river_crossings_existing_poles_and_wires_just_fine.pdf |2017 river crossing rights exhibits}} |
| |
{{ ::2017_river_crossings_existing_poles_and_wires_just_fine.pdf |2017 river crossings, no mention of pole degradation}} | {{ ::pre-np_multi_line_assertion_of_rights_2017-12-14_eversource_petition_water_crossing.pdf |2017, December 14: assertion of 2015 assertion of crossing rights}} |
| |
{{ ::e-115_and_a-111_2-15.png?linkonly |2015: "The load and added local generation in this area has not required the upgrading of either line."}} | {{ ::e-115_and_a-111_2-15.png?linkonly |2015: "The load and added local generation in this area has not required the upgrading of either line."}} |
| |
| {{ :e115:e-115_planned_upgrade_reliability_10-2012.png?linkonly |2012, October: Proposed reliability upgrade}} |
| |
| |