l-163
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
l-163 [2023/10/14 05:30] – sigridundset | l-163 [2024/07/23 04:14] (current) – sigridundset | ||
---|---|---|---|
Line 3: | Line 3: | ||
- | {{ :: | + | {{ :: |
- | {{ ::l163_0_x104_des_permit_with_waivers.pdf |2020, April 9th, DES permit with waivers}} | + | {{ :l163:l-163_and_d-108_keene_2021_03_22_pb_minutes_adopted.pdf |2021, March 22: Keene Planning Board |
+ | minutes}} | ||
- | {{ ::l163_emails_des_re_protected_species.pdf |emails re protected species}} | + | {{ :c129:373_012121_pac_minutes_final.pdf |2021, January 21: Minutes from PAC meeting.}} |
+ | |||
+ | {{ :: | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | {{ :: | ||
{{ :: | {{ :: | ||
Line 13: | Line 30: | ||
{{ :: | {{ :: | ||
- | {{ :: | + | {{ :: |
+ | |||
+ | {{ :: | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | {{ :: | ||
+ | |||
+ | {{ :: | ||
- | {{ ::l163_aot_application.pdf |Alteration of Terrain application}} | + | {{ :l163:l-162_2019-10-15_eversource_petition_crossing_keene_stoddard_sullivan.pdf |2019, October 15: petition for crossing, Keene, Stoddard and Sullivan}} |
- | {{ ::a5_eversource_copper_conductor_and_shield_wire_replacement_project.pdf |January 2021 PAC presentation}} | + | {{ :l163:l-163_2019-10-15_eversource_att_petition_crossing_keene_stoddard_sullivan.pdf |2019, October 15: petition exhibits, conductor not replaced, stays at 336.4 25/7, (2) 3#6 copperweld, (1) ADSS}} |
- | {{ ::l-163_2019_linnet_stays_crossing_keene_stoddard_sullivan.pdf |2019; crossing, conductor not replaced, stays at 336}} | + | {{ ::e_22018-9_115kv_pac_submissions.pdf |2018, October 17: PAC presentation, replace 64 structures |
- | {{ ::e_22018-9_115kv_pac_submissions.pdf |2018, October 17; PAC submission, replace 64 structures at $14. million}} | + | {{ :f162:1994_f-162_t-198_n-186_l-163_p-145_v-182_de_94-272.pdf |1995, September 6: as identified in Appendix 5 of the petition and on drawings D-7649-387/ |
l-163.1697275838.txt.gz · Last modified: 2023/10/14 05:30 by sigridundset