l-163
This is an old revision of the document!
L-163 115kV line
2020, April 9th, DES permit with waivers
2020, April 6: Alteration of Terrain plans
2020, January 12: Alteration of Terrain surfae and groundwater overlay.
Alteration of Terrain application
2019; crossing, conductor not replaced, stays at 336
2018, October 17; PAC submission, replace 64 structures at $14. million
l-163.1697275838.txt.gz · Last modified: 2023/10/14 05:30 by sigridundset