l-163 [2023/10/14 05:38] – sigridundset | l-163 [2024/07/23 04:14] (current) – sigridundset |
---|
| |
| |
{{ ::de-20-211.pdf |2021: crossing permit}} | {{ ::de-20-211.pdf |2021, May 18: crossing permit for North Branch River and an unnamed outflow stream of Island Pond in Stoddard, Otter Brook in Sullivan, the Ashuelot River in Keene, and public land owned by the State of New Hampshire in Stoddard}} |
| |
| {{ :l163:l-163_and_d-108_keene_2021_03_22_pb_minutes_adopted.pdf |2021, March 22: Keene Planning Board |
| minutes}} |
| |
| {{ :c129:373_012121_pac_minutes_final.pdf |2021, January 21: Minutes from PAC meeting.}} |
| |
| {{ ::a5_eversource_copper_conductor_and_shield_wire_replacement_project.pdf |2021, January 21 PAC presentation, replace 62 structures at $22.3 m.(estimated)}} |
| |
| {{ :l163:l-163_2020-12-30_eversource_petition_crossing.pdf |2020, December 30: petition to cross the North Branch River and an unnamed outflow stream of Island Pond in Stoddard, Otter Brook in Sullivan, the Ashuelot River in Keene, and public land owned by the State of New Hampshire in Stoddard.}} |
| |
| {{ :l163:l-163_2020-05-21_order_26356_summary.pdf |2020, May 21: Order summary}} |
| |
| {{ :l163:l-163_2020-05-21_order_26356.pdf |2020, May 21: Order}} |
| |
| {{ :l163:l-163_2020-04-28_eversource_second_supp_initial_petition.pdf |2020, April 28: second supplement to initial petition}} |
| |
| {{ :l163:l-163_2020-04-10_eversource_att_supp_initial_petition.pdf |2020, April 28: supplement to initial petition, exhibits}} |
| |
| {{ :l163:l-163_2020-04-16_staff_rec.pdf |2020, April 16: staff recommendation}} |
| |
{{ ::l163_0_x104_des_permit_with_waivers.pdf |2020, April 9, DES permit with waivers}} | {{ ::l163_0_x104_des_permit_with_waivers.pdf |2020, April 9, DES permit with waivers}} |
| |
{{ ::l163_emails_des_re_protected_species.pdf |2020, April 2: emails re protected species}} | {{ ::l163_emails_des_re_protected_species.pdf |2020, April 2: emails re protected species}} |
| |
| {{ ::l163_aot_application.pdf |2020, January 30: Alteration of Terrain application}} |
| |
| {{ :l163:l-163_keene_cc_2020_01_27_pb_agenda_packet.pdf |2020, January 27: Keene Planning Board Agenda}} |
| |
{{ ::l163_surface_and_groundwater_overlay_aot_1-12-2020.pdf |2020, January 12: Alteration of Terrain surface and groundwater overlay.}} | {{ ::l163_surface_and_groundwater_overlay_aot_1-12-2020.pdf |2020, January 12: Alteration of Terrain surface and groundwater overlay.}} |
| |
{{ ::l163_aot_application.pdf |Alteration of Terrain application}} | {{ ::l163:l-163_10-30-2019_antrim_cc_.pdf |2019, October 30: Antrim Conservation Commission minutes}} |
| |
| {{ :l163:l-162_2019-10-15_eversource_petition_crossing_keene_stoddard_sullivan.pdf |2019, October 15: petition for crossing, Keene, Stoddard and Sullivan}} |
| |
{{ ::a5_eversource_copper_conductor_and_shield_wire_replacement_project.pdf |January 2021 PAC presentation, 6replace 62 structures at $22.3 m.(estimated)}} | {{ :l163:l-163_2019-10-15_eversource_att_petition_crossing_keene_stoddard_sullivan.pdf |2019, October 15: petition exhibits, conductor not replaced, stays at 336.4 25/7, (2) 3#6 copperweld, (1) ADSS}} |
| |
{{ ::l-163_2019_linnet_stays_crossing_keene_stoddard_sullivan.pdf |2019; crossing, conductor not replaced, stays at 336}} | {{ ::e_22018-9_115kv_pac_submissions.pdf |2018, October 17: PAC presentation, replace 64 structures at $14. million (estimated)}} |
| |
{{ ::e_22018-9_115kv_pac_submissions.pdf |2018, October 17; PAC submission, replace 64 structures at $14. million (estimated)}} | {{ :f162:1994_f-162_t-198_n-186_l-163_p-145_v-182_de_94-272.pdf |1995, September 6: as identified in Appendix 5 of the petition and on drawings D-7649-387/Exhibit 1 and D-7649-387/Exhibit 2, is over the Ashuelot River in Keene, NH.}} |
| |
| |