l-163
This is an old revision of the document!
L-163 115kV line
2020, April 9, DES permit with waivers
2020, April 6: Alteration of Terrain plans
2020, April 2: emails re protected species
2020, January 12: Alteration of Terrain surface and groundwater overlay.
Alteration of Terrain application
January 2021 PAC presentation, 6replace 62 structures at $22.3 m.(estimated)
2019; crossing, conductor not replaced, stays at 336
2018, October 17; PAC submission, replace 64 structures at $14. million (estimated)
l-163.1697276311.txt.gz · Last modified: 2023/10/14 05:38 by sigridundset