T-198 115kV line | T-198 115kV line |
| |
| {{ :t198:a03_pac_es_nh_acr_t198_presentation.pdf |2025, July 23: Presentation to PAC, option 1, replace 28 structures, reconductor 1,154’ with 1272 ACSS; $17.5 m. (-50%, +200%); preferred option replace 48 structures, reconductor 1,154’ with 1272 ACSS; $24.4 m. (-25%, +50%)}} |
| |
{{ :t198:t198_completion_of_construction_notification.pdf |2023, February 3: Notice of completion of construction}} | {{ :t198:t198_completion_of_construction_notification.pdf |2023, February 3: Notice of completion of construction}} |
{{ :t198:t-198_agreemen_with_dot_2008-09-12_appendix_m.pdf |2008, September 2: Eversource Agreement with DOT and easement deed}} | {{ :t198:t-198_agreemen_with_dot_2008-09-12_appendix_m.pdf |2008, September 2: Eversource Agreement with DOT and easement deed}} |
| |
{{ :f162:1994_f-162_t-198_n-186_l-163_p-145_v-182_de_94-272.pdf |1995, September 6: two crossings as identified in Appendix 2 of the petition and on drawings D-7649-383/Exhibit 1, D-7649-383/Exhibit 2, D-7694-384/Exhibit 1, and D-7694-384/Exhibit 2, are over the North Branch of the Piscataquog River in New Boston, NH.}} | {{ :f162:1994_f-162_t-198_n-186_l-163_p-145_v-182_de_94-272.pdf |1995, September 6: The crossing of the T-198 line, as identified in Appendix 3 of the petition and on drawings D-7649-385/Exhibit 1 and D-7649-385/Exhibit 2, is over the Ashuelot River in Swanzey, NH}} |
| |