User Tools

Site Tools


x-178

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
x-178 [2025/07/24 04:26] sigridundsetx-178 [2025/08/07 12:38] (current) sigridundset
Line 654: Line 654:
 {{ :x178:x-178_eversource_longline_submittal.pdf |2015, July: PAR submittal: "If this project is awarded, PAR will longline several individuals into a ROW in order to cut up left over structure pieces and debris so they can be removed by the aircraft. Due to the lack of access, workers will need to be lowered into the ROW via longline...Workers will be transferred into different locations along an 8 mile stretch of ROW {{ :x178:x-178_eversource_longline_submittal.pdf |2015, July: PAR submittal: "If this project is awarded, PAR will longline several individuals into a ROW in order to cut up left over structure pieces and debris so they can be removed by the aircraft. Due to the lack of access, workers will need to be lowered into the ROW via longline...Workers will be transferred into different locations along an 8 mile stretch of ROW
 being inserted and extracted by longline."}} being inserted and extracted by longline."}}
 +
 +{{ :x178:2015_e_to_easton_re_x-178_pole_removal_-1.pdf |2015, February 10:Eversource to Easton re. pole removal}}
  
 {{ :x178:eversource_transmission_line_valuation_easton_001.jpg?linkonly |2014: Eversource valuation of ROW and infrastructure in Easton}} {{ :x178:eversource_transmission_line_valuation_easton_001.jpg?linkonly |2014: Eversource valuation of ROW and infrastructure in Easton}}
x-178.1753345582.txt.gz · Last modified: 2025/07/24 04:26 by sigridundset

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki