B-143 115kV line
map showing line location
2023, August 23: petition to cross; "Replacement structures will be weathering steel equivalents that will be located within 10’ of the existing structure location. The B143’s existing two static wires at all of the crossing locations that are the subject of this application will also be replaced with two optical ground wire (OPGW), whose specifications are identified on Exhibit 2
through 4."
2023, petition to cross, exhibits, Baboosic Brook
2023, June 28: DES permit with waivers grantee
2023, June 22: Environmental Resources map
2023, May 18 PAC minutes "A stakeholder suggested the ISO could take an “if you build it, they will come approach” but another stakeholder raised concern that this could be “building a bridge to nowhere.” "
2020-2023 revisions PAC presentation
Same as above but "clean"
2023, May 16, PRLAC minutes
2023, May 18, presentation to PAC, replace 46 out of 154 structures and reconductor with Optical Ground Wire (OPGW); $17.3 million
2023: May 3: Alteration of Terrain application
2019, December 19: Order summary
2019, December 19: Order
2019, November 7: staff recommendation
2019, September 4: crossing petition; 795 ASCR 36/1, (2) 7#8 Aumoweld ADSS Wire: 72 Fiber ADSS (0.643”)
2019, September 4: crossing exhibits