3135 345kV
2023, June 3, withdrawn DES permit application for construction
2022, January 18: permit for crossing Great Bog
2021, December 16: order of notice
2021, December 7: staffrecommendation
2021, November 17: Petition for crossing the Great Bog; structures 105 and 106, "Three existing conductors, one static wire and one OPGW communications wire will be transferred to the new structures."
2021, July 28: exhibits for 11/17 petition to cross the Great Bog, 1113 ASCR 54/19, 7#8 Alumoweld static/ground wire, 74 fiber.637 OPGW
2021, November 16: conditional use permit
2021, November 12: petition for crossing Great Bog, structures 105 and 106, "The 3135 Line’s existing three conductors, one static wire and one OPGW communications wire, whose specifications are identified on the Exhibit 4 Cable Schedule, will be unchanged in the course of relocation to the new replacement structures"
2020, August 14: staff recommendation and exhibits. "This is a project to replace two structures on the existing 3195 transmission line. The existing static wire will be replaced with optical ground wire, which is being replaced from other structures beyond the boundary of state-owned land."