l-163
This is an old revision of the document!
L-163 115kV line
2021, January 21 PAC presentation, replace 62 structures at $22.3 m.(estimated)
2020, April 9, DES permit with waivers
2020, April 6: Alteration of Terrain plans
2020, April 2: emails re protected species
2020, January 30: Alteration of Terrain application
2020, January 12: Alteration of Terrain surface and groundwater overlay.
2021, March 22: Keene Planning Board minutes
2020, January 27: Planning Board Agenda
2019, October 30: Antrim Conservation Commission minutes
2019; crossing, conductor not replaced, stays at 336
2018, October 17; PAC submission, replace 64 structures at $14. million (estimated)
l-163.1713618655.txt.gz · Last modified: 2024/04/20 09:10 by sigridundset