S-153 115kV line
map of project location
2023, June 27: Alteration of Terrain permit waiving
specific requirements of Env-Wq 1503.12(d)(1 & 2), Env-Wq 1503.21(d)(6 & 7), and Env-Wq 1504.09,
2023, June 16: Alteration of Terrain plans
2023, June 3, withdrawn DES permit application for construction
2023, May 23: Start of construction notice
2023, May 21: DES permit with waivers
2023, May 18: Environmental Resources Map
2023, May 18: PAC minutes "A stakeholder suggested the ISO could take an “if you build it, they will come approach” but another stakeholder raised concern that this could be “building a bridge to nowhere.” "
2023, May 18, presentation to PAC, replace 16 out of 51 structures; $5. million
2023 may 18 PAC minutes
2023, May 9: construction plans
2023, May 5 AoT application
2023, May 5: cover letter for Alteration of Terrain application. "The proposed project includes the replacement of 76 existing utility structures on the R193, A126, and H141 transmission lines that must be replaced because they have reached the end of their service life."
2023, May 5; AoT application
2023, April 3: AOT checklist
2023, March 22: Alteration of Terrain application