User Tools

Site Tools


326

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
326 [2023/10/23 06:02] sigridundset326 [2024/11/15 02:52] (current) sigridundset
Line 1: Line 1:
 345kV Line 326 345kV Line 326
  
 +{{ :b112:raarp_forms_-_rtk_request_-_redacted_3_of_4.pdf |2022, September: Reptile and Amphibian sitings including 345kV line 380 and B-112, 2023}}
  
-{{ ::326_ras_retirement_project_i_3_9_letter_es_22_x01.pdf |2022, August 19: retirement of 326 line es to iso}}+{{ :380:raarp_forms_-_rtk_request_-_redacted_4_of_4.pdf |2022, August: Reptile and Amphibian sitings, including line 380}} 
 + 
 +{{ :b112:raarp_forms_-_rtk_request_-_redacted_2_of_4.pdf |2023, July: Reptile and Amphibian sitings, including B-112 and 345kV lines 380 and 385.}} 
 + 
 +{{ ::326_ras_retirement_project_i_3_9_letter_es_22_x01.pdf |2022, August 19: retirement of 326 line RAS E$ to ISO}}
  
 {{ :326:380_-_326_start_of_construction.pdf |2022, August 5: Start of construction notification}} {{ :326:380_-_326_start_of_construction.pdf |2022, August 5: Start of construction notification}}
 +
 +{{ ::326:aot2196_rm.pdf |2022, July 29: DES permit waiving
 +specific requirements of Env-Wq 1503.12(d)(1&2), Env-Wq 1503.21(d)(6&7), and Env-Wq 1504.09, }}
  
 {{ :326:380_-_326_eversource_failure_with_rare_species_protection.pdf |2022, July 18: "NHFG wants emphasize that this is an extremely sensitive area with rare animals known to make extensive use of the {{ :326:380_-_326_eversource_failure_with_rare_species_protection.pdf |2022, July 18: "NHFG wants emphasize that this is an extremely sensitive area with rare animals known to make extensive use of the
 ROW and surrounding habitat, as well as an area of past compliance issues with Eversource."}} ROW and surrounding habitat, as well as an area of past compliance issues with Eversource."}}
  
-{{ :326:326_380_aot_permit_3-29-2022_.pdf |2022, March 29Alteration of Terrain permit with waivers}}+{{ :326:380_-_326_nhb_email.pdf |2022, June 20New Hampshire Heritage Bureau email}}
  
-{{ ::326:aot2196_rm.pdf |2022, July 29: Alteration of Terrain permission from DES}}+{{:a3_eversource_new_hampshire_asset_conditions_wood_structure_replacement.pdf|2022, June 15 presentation to PAC }}
  
-{{ :326:380_-_326_des_permit_with_waivers_2022.pdf |2022, July 29DES permit with waivers}}+{{ :326:326_4-15-2022.pdf |2022, April 15application to Town of Hudson for conditional use permit}} 
 + 
 +{{ :326:326_-2022-010-order-of-notice.pdf |2022, April 11: Order of Notice,line has three ACSR 850.8 Kcmil phase conductors, a single 7#8 Alumoweld static wire and a single 0646" OPGW wire will be transferred to the replacement structures.}} 
 + 
 +{{ :326:326_380_aot_permit_3-29-2022_.pdf |2022, March 29: AoT application, GZA}}
  
 {{ :326:326_380_ground_and_surface_water_aot_3-2022.pdf |2022, March ground and surface water AOT}} {{ :326:326_380_ground_and_surface_water_aot_3-2022.pdf |2022, March ground and surface water AOT}}
Line 19: Line 31:
 {{ :326:326_380_wetlands_damage_aot_3-2022.pdf |2022, March: disturbed areas AOT}} {{ :326:326_380_wetlands_damage_aot_3-2022.pdf |2022, March: disturbed areas AOT}}
  
-{{ :326:380_-_326_nhb_email.pdf |2022, June 20: New Hampshire Heritage Bureau email}} +{{ ::1-cre-2022-010-petition.pdf |2022, March 29: petition for crossings}}
- +
-{{ ::1-cre-2022-010-petition.pdf |2022, March 29: petition}}+
  
 {{ ::2-cre-2022-010-petition-attachments.pdf |2022, March 29: petition attachments}} {{ ::2-cre-2022-010-petition-attachments.pdf |2022, March 29: petition attachments}}
  
-{{:a3_eversource_new_hampshire_asset_conditions_wood_structure_replacement.pdf|2022, June 15 presentation to PAC }}+{{ :326:326_3-17_2022_order.pdf |2022, March 17: Order re. petition for crossing rivers/public lands}}
  
 {{ ::3-cre-2022-010-energy-staff-recommendation.pdf |2022: staff recommendations}} {{ ::3-cre-2022-010-energy-staff-recommendation.pdf |2022: staff recommendations}}
Line 33: Line 43:
 {{ ::326_345kv_line_diagram.pdf |line diagram}} {{ ::326_345kv_line_diagram.pdf |line diagram}}
  
-{{ ::cre-2022-010-order-of-notice.pdf |2022order}} +{{ :326:326_.pdf |2021, May 4Order, The Company proposes to replace existing Structure 5 with a newly constructed steel support structure. The three existing conductors and the existing static wire and optical ground wire (OPGW) on the line will be transferred to the new structure. The Company also seeks an after-the-fact license for the 2018 replacement of Structure 4 at the same crossing location}}
- +
-{{ ::de-21-048-order-26-474.pdf |2021: order}}+
  
 {{ ::a9_eversource_345kv_structure_replacement_projects.pdf |2017, December presentation to PAC, replacement of 43 out of 166 poles.}} {{ ::a9_eversource_345kv_structure_replacement_projects.pdf |2017, December presentation to PAC, replacement of 43 out of 166 poles.}}
 +
 +{{ ::k165_p145_.pdf |2016, January 7: TCA approval, apparently reliability}}
 +
 +{{ :326:326_proposed_reliability_upgrade_10-2012.png?linkonly |2012, October, proposed reliability upgrade}}
  
 {{ :psnh_cost_per_mile_115kv.jpg?linkonly |}} {{ :psnh_cost_per_mile_115kv.jpg?linkonly |}}
  
326.1698055364.txt.gz · Last modified: 2023/10/23 06:02 by sigridundset

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki