User Tools

Site Tools


326

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
326 [2024/03/27 07:02] sigridundset326 [2024/11/15 02:52] (current) sigridundset
Line 1: Line 1:
 345kV Line 326 345kV Line 326
  
-{{ :326:326_.pdf |}}+{{ :b112:raarp_forms_-_rtk_request_-_redacted_3_of_4.pdf |2022, September: Reptile and Amphibian sitings including 345kV line 380 and B-112, 2023}}
  
-{{ :326:326_-2022-010-order-of-notice.pdf |}}+{{ :380:raarp_forms_-_rtk_request_-_redacted_4_of_4.pdf |2022, August: Reptile and Amphibian sitings, including line 380}} 
 + 
 +{{ :b112:raarp_forms_-_rtk_request_-_redacted_2_of_4.pdf |2023, July: Reptile and Amphibian sitings, including B-112 and 345kV lines 380 and 385.}}
  
 {{ ::326_ras_retirement_project_i_3_9_letter_es_22_x01.pdf |2022, August 19: retirement of 326 line RAS E$ to ISO}} {{ ::326_ras_retirement_project_i_3_9_letter_es_22_x01.pdf |2022, August 19: retirement of 326 line RAS E$ to ISO}}
Line 20: Line 22:
  
 {{ :326:326_4-15-2022.pdf |2022, April 15: application to Town of Hudson for conditional use permit}} {{ :326:326_4-15-2022.pdf |2022, April 15: application to Town of Hudson for conditional use permit}}
 +
 +{{ :326:326_-2022-010-order-of-notice.pdf |2022, April 11: Order of Notice,line has three ACSR 850.8 Kcmil phase conductors, a single 7#8 Alumoweld static wire and a single 0646" OPGW wire will be transferred to the replacement structures.}}
  
 {{ :326:326_380_aot_permit_3-29-2022_.pdf |2022, March 29: AoT application, GZA}} {{ :326:326_380_aot_permit_3-29-2022_.pdf |2022, March 29: AoT application, GZA}}
Line 32: Line 36:
  
 {{ :326:326_3-17_2022_order.pdf |2022, March 17: Order re. petition for crossing rivers/public lands}} {{ :326:326_3-17_2022_order.pdf |2022, March 17: Order re. petition for crossing rivers/public lands}}
- 
- 
- 
  
 {{ ::3-cre-2022-010-energy-staff-recommendation.pdf |2022: staff recommendations}} {{ ::3-cre-2022-010-energy-staff-recommendation.pdf |2022: staff recommendations}}
Line 42: Line 43:
 {{ ::326_345kv_line_diagram.pdf |line diagram}} {{ ::326_345kv_line_diagram.pdf |line diagram}}
  
-{{ ::cre-2022-010-order-of-notice.pdf |2022order}} +{{ :326:326_.pdf |2021, May 4Order, The Company proposes to replace existing Structure 5 with a newly constructed steel support structure. The three existing conductors and the existing static wire and optical ground wire (OPGW) on the line will be transferred to the new structure. The Company also seeks an after-the-fact license for the 2018 replacement of Structure 4 at the same crossing location}}
- +
-{{ ::de-21-048-order-26-474.pdf |2021: order}}+
  
 {{ ::a9_eversource_345kv_structure_replacement_projects.pdf |2017, December presentation to PAC, replacement of 43 out of 166 poles.}} {{ ::a9_eversource_345kv_structure_replacement_projects.pdf |2017, December presentation to PAC, replacement of 43 out of 166 poles.}}
326.1711537332.txt.gz · Last modified: 2024/03/27 07:02 by sigridundset

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki