S-136 115kV line
2023, December 19: petition to cross
2023, exhibits for crossing
2023, November 15: Eversource TOPAC (Transmission Owners Planning Advisory Committee presentation to PAC, "Rebuild the aging 115kV line with larger conductor and OPGW "
2023, November 14: WMNF FOIA response cover letter
2023 October 3: WMNF small projects form for a $140 million dollar line rebuild
2023, May 31, Stantec to E$ WMNF
2023, May 31: E$ letter and plans re. S-136 rebuild WMNF
2020, August 20: order Nisi granting crossings
2020, August 20: petition to cross, "The existing static wire will be replaced with optical ground wire in all crossing locations. No conductor, shield wire, or neutral wire will be added or replaced as part of the structure replacements; instead, existing conductors and wires will be transferred to the newly constructed steel support structures."
2020, August 7, staff revised map
2020, July 31: staff recommendation, The structure will have conductors for the S 136 Transmission Line
consisting of (3) 795 kcmil ACSR 36/1 cables and (1) .457 OPGW.
2020, July 2: USFS decision permitting project
2020, May 22: Start of construction form
2020, April 9: DES permit waiving
specific requirements of: Env-Wq 1504.09,
2020, April 4: supplemental petition to cross; "Eversource intends to complete four structure replacements in 2020 (Str. 293, 294 and 298, 299) along the existing S136 Line in addition to replacing the existing static wire with OPGW'
2019, June through October: crossing petition exhibits, one static wire and one OPGW
2020, April 1: crossing supplemental petition
s-136_staff_recommendation.pdf
2020, April 1: E$ Petition for crossings
2020. April 1: crossing petition supplement exhibits, dated 6/19-11/19
2020, April 1: crossing petition supplement, " Eversource intends to complete four structure replacements...(Str. 293, 294 and 298, 299)... in addition to replacing the existing static wire with OPGW"
2020, March 20: AoT application, Stantec
2019, October 24: PAC presentation local system plan, under-construction, $6.2 m. replace existing structures
2019, September 3: Petition to cross Androscoggin, Gorham and Randolph, no mention of OPGW
2019, September 3: exhibits for crossing Androscoggin, Gorham and Randolph. Two OPGW lines, conductors remain the same.
s-136_1.jpg
s-136_5.jpg
s-136_8.jpg
s-136_14.jpg
s-136_18.jpg
Structure with 795 ASCr conductor and 10 insulators