v-191
This is an old revision of the document!
V-191 115kV line, built in 2005
2021, October 20; PAC presentation, replace 41 out of 60 structures at $11 m.
v-191.1692603957.txt.gz · Last modified: 2023/08/30 07:50 (external edit)