R-193 115kV line

map showing line location

2023, June 15: AoT application checklist

2023, April 6: AoT application, GZA

2023, June 27: DES permit with waiving specific requirements of Env-Wq 1503.12(d)(1 & 2), Env-Wq 1503.21(d)(6 & 7), and Env-Wq 1504.09,

2023, June 16: Alteration of Terrain plans

2023, June 15: DES permit waiving specific requirements of Env-Wq 1503.12(d)(1 & 2), Env-Wq 1503.21(d)(6 & 7), and Env-Wq 1504.09

2023, May 23: Start of construction notice

2023, May 21: DES permit with waivers

2023, May 18: Environmental Resources Map

2023, May 18 PAC minutes "A stakeholder suggested the ISO could take an “if you build it, they will come approach” but another stakeholder raised concern that this could be “building a bridge to nowhere.” "

2023, May 18, presentation to PAC, replace 30 out of 177 structures; $7.7 million

2023, May 5: AOT permit application

2023, May 5: cover letter for Alteration of Terrain application. "The proposed project includes the replacement of 76 existing utility structures on the R193, A126, and H141 transmission lines that must be replaced because they have reached the end of their service life."

2023, April 17: petition for crossing. DOE has not posted the exhibits for this crossing

2023, April 3: AOT checklist

2023 April: AoT permitting plans

2023, March 23: Alteration of Terrain application

2020, October 20: exhibits for supplementary petition for crossing

2020, October 20: staff recommendation

2020, October 7: petition for crossing

2020, October 7: petition for crossing exhibits

map of line location

2012, October: Proposed reliability upgrade