This is an old revision of the document!
X-178 115V Line, built in 1948-9 with 336 ASCR, Streeter Pond Tap to Whitefield "upgraded" to 795 ASCR in 1969 when U-199 is built, Beebe River to Streeter Pond tap "upgraded" to 795 ASCR in 1986.
Pole height increases, WMNF, Lincoln, Woodstock, Easton and Sugar Hill
Geotechnical drilling White Mountain National Forest
White Mountain National Forest documents
2025, March 31: Eversource request to withdraw X-178 from docket.
2025, March 28: Thornton to DES email re. landfill dump
2025, May 28: DES email re. Thornton dump landfill
2025, March 14: Eversource withdraws DES permit requests for geotechnical boring in WMNF.
2025, March 17: SEC Order taking jurisdiction of Eversource's proposed X-178 project.
2025, March 4: Counsel for the Public power-point presented at SEC hearing.
2025, March 4: Transcript of SEC Hearing
2025, March 3: PUC clarification on scope of docket.
2025, February 26: GZA response to questions about geotechnical boring in WMNF
2025, February 22: Comment on withheld documents
2025, February 12: Final summary of significant problems with Eversource's proposed X-178 rebuild
2025, February 11: Eversource to DES email re Thornton Dump Landfill borings
2025, February 11: GZA boring plan Thornton dump
2025, February posted on PAC site: 2024-12-20 Mass AG Comment on Eversource Local System Plan
2025, February 7: email re. incomplete application for geotechnical boring in WMNF
2024, February 5: Comment: Three questions and a request to the SEC
2025, February 2: Comment on Landownerless DES permits
2025, January 31: Comment on construction without a permit
2025, January 30: Comment on Eversource Errors
2025, January 24: Comment on AG and DES redacted "waiver" of landowner signatures on DES forms
2025-1-22: Start of Construction Notice for X-178 (2), Eversource to DES, released in a 91-a.
2025, January 23: Comment profile ACSS vs. ACCC
2025, January 22: Forest Service project vicinity map, X-178 (1)
2025, January 22: Forest Service specialist review form, X-178 (1)
2025, January 22: Comment on information withheld by Eversource
2025, January 19: Comment on structure age
2025, January 7: Eversource application for a variance from Easton's structure height restriction.
2025, January: Eversource Site Plan Review application to Easton
2025, January: Eversource application for a Conditional Use Permit for Easton Steep Slopes areas
2025, January 14; Comment on Eversource application for a Wetlands Conditional Use Permit
2025, January 9: Comment on lack of agency approvals or oversight of Eversource's X-178 project
2025, January 9: Comment on ACCC and ice loading
2025, January 7: Eversource response to more questions on the X-178
2025, January 6: Comment on Eversource structure ratings
2025, January 6: More sizeable damages
2025, January 5: Comment; Conservation Biology; Effects of Roads on Animals, 2000
2025, January 4: Electricity as distinct from Intelligence
2024, December 30: Failure of Evidence by Eversource
2024, December 30: Views are not averaged
2024, November, Synapse questions to Eversource re. X-178
2024, December 29: Question on crossing specs.
2024, December 29: More apparent discrepancies
2024, December 28: Comment on Northern Pass restoration compared to X-178.
2024, December 27: Comment on NESC 250D
2024, December 26: When does E$ plan to return?
2024, December 24: Significant change
December 23: Eversource waivers from DES permit requirements
2024, December 22: X-178 structure replacement history
2-24, December 18: Annotation of Eversource statement
2024, December 17: Comment to SEC
2024, December 16: Comment to SEC
2024, December 14: Comment to CFP
2024, December 12: Eversource summary technical report produced for NH Site Evaluation Committee
2024, November 21: NESCOE seeks power for itself, not to end the asset condition exploitation.
2024, November 23: Comment on DE-24-087
2024, November 19: NBC-CT episode on X-178, consumer costs and lack of oversight
2024, November 18: Information submitted to SEC
2024, November 18 (discovered): X-178 (2) Phase 2 permitting plans
2024, November 15: DES and Thornton emails re Thornton Landfill Dump
2024, November 13, NESCOE questions to Eversource re. X-178
2024, November 13: Connecticut OCA questions to Eversource on X-178
2024, November 4: kp comment to Forest Service re. inaccuracies in project description
2024, October 29: kp letter to PAC and Eversource re. U-199 and Q-195 as connecting to the Coos Loop
2024, October 23: Minutes of X-178 PAC meeting posted January 7, 2025.
2024, October 23: "Asset Condition" project template.
2024, October 16: Eversource response to criticism of its "proposal" to rebuild the X-178.
2024, October 3: Easton Planning Board minutes
2024, September 12: Road Grading White Mountain National Forest
2024, September 8 (discovered on Eversource's site): Campton proposed" structure height increases.
204, September 8: Easton "proposed" structure height increases.
2024, September 8: Thornton "proposed" structure height increases.
2024, September 8: Lincoln "proposed" structure height increases
2024 September 8: Woodstock "proposed" structure height increases
2024, September 8: Sugar Hill "proposed" structure height increases
2024, September 8: (posted earlier): Bethlehem "proposed" structure height increases.
2024 September 8: Dalton "proposed" structure height increases.
2024, September 8: Whitefield "proposed" structure height increases
2024, August (received): post-construction grade of roads, pull pads and crane pads, Easton Phase 1
2024, August 19: InDepthNH article on X-178 lawsuit
2024, August 19: Consumer Advocates of New England letter to Eversource re.X-178
2024, August 16: Consumer Advocates of New England press release re. X-178
2024, August 12: Caledonian-Record article on the X-178; NESCOE and the SEC.
2024, August (received): post-construction grade of roads, pull pads and crane pads, Easton Phase 1
2024, August 12: ISO response to question on the absence of the X-178 from the asset condition list
2024, undated redacted communication DES with DES Attorney Courtney Lockwood
2024, August 5: Easton Selectboard minutes
2024, August 1: Easton Planning Board draft minutes
2024, July 18: Caledonian Record
2024, July 18: DOE staff recommendation
2024, July 11: Eversource crossing application
2024: Eversource crossing exhibits and line profile drawings
2024, July 23: Revised AoT permitting plans
2024, July 17: email re. revised AoT permitting plans, 1
2024, July 17: Email re. revised AoT permitting plans, 2
2024, July 16: aquifer and wetlands
2024, July 15: Inquiry by InDepthNH
2024, July 11: draft minutes Easton Planning Board meeting with Eversource re site plan review
2024, July 8: Inquiry by InDepthNH
2024, July 8: Inquiry by InDepthNH
2024, July 8: Inquiry by InDepthNH
2024, July 8: Inquiry by InDepthNH
2024, July 5: Inquiry by InDepthNH
2024, July 5: DES and NH AG conversation re. easement-encumbered landowner rights
2024: X-178 (3) undated email to LAC providing link to DES Wetlands permit application
2024: X-178 (2), existing and proposed structure heights, Bethlehem
2024, July 5: kp email to DES, AG and others re. lack of landowner signatures on AoT applications.
2024, June 21: NH DES hearing presentation
2024, June 21: Letter to DES re DES ignoring its requirement that landowners sign AoT permits
2024, June 20: follow up presentation to PAC
2024, June 20: Minutes of PAC meeting, second presentation of X-178
2024, June: Acadia Center article on X-178.
2024, June 18: kp comment on ES Hobson's Choice presentation #2 to PAC
2024, June 17: Review by NH Department of Historical Resources, X-178(1)
2024, June 13: Letter to ISO-NE, PAC and Eversource re. FERC Order 1920 and need to cancel X-178
2024, June 12: Caledonian Record, legal notice, DES wetlands
2024, June 12: DES notice in Littleton Courier
2024, June 10: re. X-178(1) Aot permit application
2024, May 30: re AoT wetlands file, 1
2024, May 30: re AoT wetlands file, 2
2024, May 30: re AoT wetlands file, 3
2024, May 29: X-178(1) AoT permit application
2024, May 29: X-178(1) AoT permit application
2024, May 29: X-178(1) Rebuild Project Additional Wetland Information Table
2024, May 29: X-178 (1) email re DES file
2024, May 29: X-178 (1) email re permit conditions
2024, May 28: X-178(2) Phase 1 impacts per AoT = 1,434,210 square feet aka 33 acres
2024, May 24: DES issues permit for Alteration of 33 acres of Terrain on Section 2, Phase 1
2024, May 24: DES memo re X-178 line in Thornton Dump Landfill
2024, May 21: Caledonian Record article on petition to SEC (Sugar Hill did not join)
2023, May 16: Endangered Species list
2024, May 13: Minutes, Sugar Hill Selectboard re. petition to SEC
2024, May 12: k pastoriza letter to ES and PAC re proposed conductor clearances
2024, May 8: X-178 (1) extension agreement with DES, signed
2024, May 3: kp letter to FS re Russell Pond SUP
2024, May 1: DOT driveway permit cover letter
2024, April 30: DES issues permit for impacts to protected shoreland in Campton
2024, April 30: DES issues permit for impacts to protected shoreland in Thornton
2024, April 30: DOT driveway permit for easement
2024, April 26: k pastoriza letter to E$, ISO re new plan for X-178
2024, April: X-178 PAC presentation Annotated
2024, April 26: Eversource BMP violations
2024, April 26: Campton protected shoreland impacts
2024, April 26: Thornton protected shoreland impacts
2024, April 16: "Row Concern DES Permits" 1
2024, April 16: "Row Concern DES Permits" 2
2024, April 12: Eversource delays its May PAC presentation
2024, April 10: Comments by Jim Page
2024, April 10: Comments by Mike Kenney
2024, April 9: kp comment on rebuild as a response to claimed need to replace 41 out of 1160+ poles.
2024, April 7: comment on Eversource and FirstLight
2024, April, 2: PAC responses to stakeholder comments
2024, March 30: X-178-1; 77.4 acres excavated
2024, March 20: kp letter to PAC and Eversource re. percent of category c poles
2024, March 20: kp letter to PAC re. OPGW
2024, March 20: Maine PUC comments
2024, March 18, k pastoriza question re structure locations (incorrectly dated)
2024, March 17: X-178 presentation to PAC, annotated
2024, March 15: NESCOE comments
2024, March 15: Dredge and Fill PRLAC comments
2024, March 15: k. pastoriza alternatives to project proposal
2024, March 9: k pastoriza request for Category C POLE locations
2024, March 5: proof of deliveries of X-178(3) hard copies
2024, March: Eversource wetlands violations
2024, March 1: Questions on X-178
2024, April 29: emails re Proof of transmittal X-178(3)
2024, February or March, posted after 2/28 PAC meeting: PAC "Guidelines" for public comments
2024, February 29: PAC meetings fail to ensure adequate project review
2024: Environmental Permitting Planset, Easton, no wetlands scientist stamp.
2024, February 28: Eversource presentation to PAC
2024, February 27: Questions on Eversource PAC presentation
2024, February 27: kp question on X-178 presentation to the PAC document
2024, February 27: kp letter to PAC; X-178 is not an asset condition project
2024, February 26 (dated): Eversource response to k. pastoriza questions.
2024, February; Reel Brook Trail to be used as access road, pending WMNF approval, section 1
2024, February; Reel Brook Trail to be used as access road, pending WMNF approval, section 2
2024, January 25: Transmission owners database
2024, January 25: letter to Eversource re. transmission owners database
2024, January 18: kp questions on structure locations
2024, January 6, cover letter for wetlands permit application, Dalton
2024, January 3: Easton Conservation Commission draft minutes
January 6, 2024: Eversource presentation to Easton Conservation Commission with commentary
January 3, 2024: Eversource presentation to Easton Conservation Commission
2023: smooth green snake flyer
2023, October 10: email to Forest Service re. roadless construction
2023, October 5: Fish & Game and Eversource email
2023, October 1: Letter to Forest Service on Eversource rebuild of S-136 transmission line
2023, September 21: Letter to Eversource re. Asset Condition problem.
2023, September 11: Questions for Eversource PAC presentation
2023, September 7: Fish and Game and Eversource email
2023, September: X-178 crossing of Bog Pond
2023, September: view of Lafayette
2023, September: view of Mt. Wolf
2023, September: Bog Pond and east side of Old Kinsman Notch. X-178 line below cliffs on left.
2023, September: X-178 line below Cliffs, and Bog Pond
2023, September: Bog Pond and X-178, South Kinsman behind
2023, September: Cliffs with X-178 below, and Bog Pond
2023, August 23: letter to PAC and Eversource
2023, August 1; Campton, Thornton and Woodstock DRAFT proposed construction plans
2023, August 1; North Woodstock to Sugar Hill DRAFT proposed construction plans
2023, August 1; Sugar Hill, Bethlehem, Dalton, Whitefield DRAFT proposed construction plans
2023, Inspection/Treatment tags on 1948 section of line
2023, July 3; drone image X-178
2023, July 23; drone image x-178 no road
2023, June 22: Natural Heritage Bureau datacheck email 1
2023, June 22: Natural Heritage Bureau datacheck email 2
2023, June; questions for Eversource
2023, May 24; response to Eversource answers to questions
2023, May; questions for Eversource
2023, May letter to ISO re X-178 and Asset Condition problem
2023, May 16: Fish and Wildlife letter re. endangered species
2023, April 22: "Dear Neighbor" letter
2023, April; Project Fact Sheet sent to landowners claiming reliability
2023, April 14; "Confidential" Project information sent with the email above.
2023, April 7: Project presentation to WMNF.
2023, April 13: Archaeological survey proposal, WMNF
2022, September 19: Survey Postcard
2021, February 18: Transmission line aerial overview plans, GZA
2020, January 30: Aerial overview plan
2019: ISO adds wording to OATT Schedule 12B #8.
2018, October 17: PAC meeting minutes
2018, October 17; PAC submission, replace 56 structures out of 570 at $11.2 million, later cancelled
2017, November 7: Helicopter patrols on Northern Pass route
2017 river crossing application, no mention of pole condition problems.
circa 2017 crossbar and insulator replacement
2016: Bog Pond Scenic Area proposal rejected by WMNF
2016: Bog Pond Scenic Area procedural history
Winco Longline job hazard analysis
PAR X-178 Health and Safety Plan
2014: Eversource valuation of ROW and infrastructure in Easton
2013, May 22: Northern Pass and WMNF Special Use Permit requirements
NP Special Use Permit info. for WMNF with map showing where Eversource has no ROW
2013; found poem: Muntz WMNF special use permit application
Bog Pond area with poles dumped in 1986 "upgrade"
2013, September 5: Northern Pass amended attachment to Special Use Permit
2007 Special Use permit, Easton, Lincoln, Woodstock
2007 Special Use permit; Russell Pond, Horner Brook
1987 Pemigewasset crossing, North Woodstock
1986 'upgrade' paid for by Hydro-Quebec
Pesticides used on ROW until 1985
1970, November 13: Special Use Permit for powerline in Woodstock
1970, March 25: FS to DOT re Special Use Permit for powerline in Woodstock.
1970, February 19: Plymouth Record on powerline relocation
1970, February 10: Forest Service denies PSNH special use permit for new line
1950 PSNH transmission map showing X-178
1948, June 15: WMNF SUP permit for X178, "part of a similar line from Northumberland to Woodstock"
1945: Forest Service suggests Bog Pond rather than Coppermine Trail