The H-141 line runs for 19.2 miles through Sandown, Danville, Fremont, Exeter, Stratham and North Hampton. Conductor is 336 ASCR 26/7 (19 m), 1272 ASCR (.1 m), 1590 ACSS (.2 m).
2023, May 18: map showing line location
2023, October: ES Draft presentation to PAC
2023, June 27: DES permit waiving
specific requirements of Env-Wq 1503.12(d)(1 & 2), Env-Wq 1503.21(d)(6 & 7), and Env-Wq 1504.09,
2023, June 15: DES permit waiving
specific requirements of Env-Wq 1503.12(d)(1 & 2), Env-Wq 1503.21(d)(6 & 7), and Env-Wq 1504.09
2023, June 16: AoT plans, Normandeau
2023, June 15: AoT application checklist
2023 May 25: Danville Planning Board: "The structure replacements were selected based on site visit evaluations conducted by Eversource and must be replaced for the transmission line to continue to function safely and reliably."
2023, May 23: license revision memo; The attached license has been revised to include additional information regarding the identification, specifications, and location of the subject utility lines as set forth in the Application requesting a Crossing License
2023 May 23: revised license; "The proposed project for the Hl41 Line encompasses the replacement of existing wooden structures in Exeter, Brentwood, and Fremont. Structures 164,169,I70,I79,180, 181, 250, and 251 need to be replaced promptly to continue to function safely and reliably. Those structures will be replaced with weathering steel equivalents... The H 141's existing three-phase conductors, single OPGW wire, and single static wire will not be changed in the course of performing the steel structure replacements"
2023, May 21: DES permit with waivers
2023, May 23: Start of construction notice
2023; May 18: PAC minutes
2023, May 18, presentation to PAC, replace 35 out of 182 structures; $8.4 million
2023, May 18: Environmental Resources Map; 'Existing conductors and static wire will be transferred to new steel poles'
2023, May 9: construction plans
2023, May 5: AOT permit application
2023, May 5: cover letter for Alteration of Terrain application. "The proposed project includes the replacement of 76 existing utility structures on the R193, A126, and H141 transmission lines that must be replaced because they have reached the end of their service life."
2023 April 26: crossing license; "The proposed project for the H141 Line encompasses the replacement of existing wooden structures in Exeter, Brentwood, and Fremont. Structures 164, 169,170,179, 180, 181, 250, and 251 need to be replaced promptly to continue to function safely and
reliably. Those structures will be replaced with weathering steel equivalents that will be located within 10' of the original structure location. The H141's existing three phase conductors, single OPGW wire, and single static wire will not be changed in the course of performing the steel structure replacements"
2023 April 20: staff recommendation
2023; April 19: crossing application
2023, April 6: AoT application, GZA
2023, April 3: AOT checklist
2023 April: AoT permitting plans
2023; March 6: crossing exhibits; state lands Exeter and Brentwood, state waters in Fremont
2023, March 21: Alteration of Terrain application. "New steel poles will be installed. Existing conductors and static wire will be transferred to new steel poles."
2022, June 30: complete DE-22-049 document listing E$ proposed spending; $657,000.
2021; October 19: crossing order of notice
2021; October 7: Brentwood planning board minutes
2021; September 10: staff recommendation
2021,, September 7: transfer from PUC to DOE
2021, June 17: crossing petition
2021, June 17: crossing exhibits
2021 June 17: E$ crossing petition, state owned lands Brentwod and Exeter, replace 9 structures
2021; May 7: E$ crossing exhibits State owned land Brentwood and Exeter
2021; March 19: ES permit by notification
2020, April 1: order summary
2020, April 1: order
2020, March 10: order summary
2020, March 10: order
2020, February 26: revised staff recommendation
2019, November 12: staff recommendations
2019, July 9: order
2019, July 16: order granting crossing of Exeter River:
2019, July 9: order summary
2019, July 1: revised staff recommendations
2019; May: Exeter Conservation Commission meeting packet
2019, May 21: staff recommendations, revised
2019, May 17: staff recommendations
2019, May 13: crossing petition Swamscott River and State Lands
2019, May 13: crossing exhibits, Swamscott River and State Lands
2019, May 10: crossing petition, revisions
2019, May 10: petition revisions
2019, April 22: staff recommendation
2019, January 19: crossing petition Exeter River, Chester|
2019, January 9: crossing petition Danville
2019, January 9: crossing exhibits Exeter River, Danville
2019, January 7: crossing petition Brentwood
2018, October 17, presentation to PAC, replace 49 structures, $8.3 million
2018; July 17: notice of decision Sandown Planning Board
2012, October, Proposed reliability upgrade